Latest news
Here you can find the latest news on PANIC project.
First software integration tests
On end November 2011, the first software integration tests were done at MPIA (Heidelberg).
PANIC Status Sep-2011
It is presented an detailed overview about the current status of the PANIC instrument and of each development package on September 2011.
First optical elements
Last October we received the first optical elements, the uncoated mirrors.
Order of Optic and Cryostat
On May 2009, the Optic was ordered to SESO. And at the same time, the cryostat was also ordered to Reuter.
We hope the optic will be delivered in one year.
Arrival of FPA
On last December 2008 the FPA arrived at MPIA. You can see some photos here.
Successful Optics FDR
Last 24th September took place at IAA (Granada-Spain) the Optics Final Design Review of PANIC.
Optics Final Design Review (FDR)
The Optics Final Design Review (FDR) documentation has been delivered for reviewers at begining of September 2008. Next September, 24th 2008 the Optics FDR will be hold at IAA (Granada).
Preliminary Design Review (PDR)
Last 21th November took place at IAA (Granada-Spain) the PANIC Preliminary Design Review.
