PANIC Home / Downloads



Right menu

Latest News

First software integration tests

On end November 2011, the first software integration tests were done at MPIA (Heidelberg).

PANIC Status Sep-2011

It is presented an detailed overview about the current status of the PANIC instrument and of each development package on September 2011.

Panic Status September 2011

L2 dummy criogenic test

First lens criogenic cycling test.

First optical elements

Last October we received the first optical elements, the uncoated mirrors.


Downloads

This folder has some documents to download by external and internal users.

Panic Status September 2011

This document describes the status of the PANIC instrument on September 2011.

Optics design

Optics_1gr

optics_1.jpg 24.76 kB